The Castelo do Bode subsystem, inaugurated in 1987, was extended in 2007, and now has a nominal capacity of 625.000 m3/day. |
![Tagus Subsystem Tagus Subsystem](/EPAL/images/default-source/água/infra-estruturas-do-sistema-de-distribuição/tagus-subsystem.jpg?sfvrsn=6) | Tagus Subsystem
The Tagus subsystem was inaugurated in 1940 and extended in 1963 and 1976 to a nominal capacity in the order of 400.000 m3/day. |
![Alviela Subsystem Alviela Subsystem](/EPAL/images/default-source/água/infra-estruturas-do-sistema-de-distribuição/alviela-subsystem.jpg?sfvrsn=2) | Alviela Subsystem
The Alviela subsystem in operation since 1880. |
![Vila Franca de Xira - Telheiras Pipeline Vila Franca de Xira - Telheiras Pipeline](/EPAL/images/default-source/água/infra-estruturas-do-sistema-de-distribuição/vila-franca-de-xira---telheiras-pipeline.jpg?sfvrsn=6) | Vila Franca de Xira - Telheiras Pipeline
The Vila Franca de Xira - Telheiras pipeline runs between the Vila Franca de Xira I Pumping Station and the Telheiras reservoir in Lisbon. Its transport capacity is around 240.000 m³/day. |
![Adutor de Circunvalação Adutor de Circunvalação](/EPAL/images/default-source/água/infra-estruturas-do-sistema-de-distribuição/adutor-de-circunvalação.jpg?sfvrsn=4) | Circunvalação Pipeline
The Circunvalação pipeline runs between the Vila Franca de Xira II Pumping Station and the Vila Fria reservoir. Its transport capacity is aproximately 410.000 m³/day. |
![Water Treatment Plant (ETA) Water Treatment Plant (ETA)](/EPAL/images/default-source/água/infra-estruturas-do-sistema-de-distribuição/water-treatment-plant-(eta).jpg?sfvrsn=4) | Water Treatment Plant (ETA)
EPAL has two ETA’s, one allocated to the Castelo do Bode sub-system treats the water collected from the Castelo do Bode lagoon and the other treats the water collected in Valada Tejo.
|